Overnight capital cost
Renewable Energy
The capital cost of a project if it could be constructed overnight. This cost does not include the interest cost of funds used during construction.
- — ODOE Glossary of Energy Terms retrieved 2014-06-15
The capital cost of a project if it could be constructed overnight. This cost does not include the interest cost of funds used during construction.