All > Science > Energy > Renewable Energy > Solar Energy
- Water rights that are more recent than older or more senior rights. See also Senior water rights
- Browse Related Terms: Augmentation water, Benthic, Channel incision, drawdown, Floodplain, Groundwater overdraft, hydrology, Inflow, Junior water rights, Kiva, Outflow, Perennial/safe/sustainable yield, Phosphorous, Point of diversion, Pueblo rights, Thermal water, Water right
All > Science > Energy > Renewable Energy > Solar Energy
A strategy for managing materials used at a project that ensures materials become available as needed to support activities, but are not stockpiled at the project location in excess of what is needed at any point in time. The just-in-time approach controls costs by avoiding the accumulation of inflated inventories, reducing the potential for stockpiled materials to go out-of-date or otherwise become obsolete, and minimizing product storage and management requirements. When applied to hazardous chemicals, this approach reduces waste generation, the potential for mismanagement of materials and the overall risk of adverse impacts resulting from emergency or off-normal events involving those materials.
- Browse Related Terms: Acute, Adverse environmental impacts, Best Management Practice (BMP), Compensatory mitigation, Contrast level, Design features, Direct impacts, Hedonic statistical framework, Impulsive noise, Just-in-time ordering, Key observation point(s) (KOP), Mitigation, Mitigation measures, PFYC, Region of Influence (ROI), Richter Magnitude Scale, View duration, Visual mitigation