Engineering Change Order (ECO) (ECO)
Climate Change 922 terms
An engineering task or project directly resulting from an Engineering Change Request. It is tracked and addresses project requirements, analysis, design, development, testing, and documentation.
- — ARM Climate Research Glossary retrieved 2014-06-12