Long Lead Items Long Range Air Launched Target (LRALT)
Defense
Those components of a system for which the times to design and fabricate are the longest, and, therefore, to which an early commitment of funds may be desirable in order to meet the earliest possible date of system completion. Two-stage, air launched ballistic missile target being developed for MBRV-4.